Model FLE Assembly
Casing Assembly
750-192
3-23
17. Install Outer Casing
•
Stick the approximately 2” square pieced of insula-
tion on the inner casing. Each panel will receive two
pieces, one at the top and another in the middle near
the bottom. See the drawings for placement loca-
tions.
•
Position the roof casing on the top frame edge so that
the 4-1/4" side is on top. Line up the edge of the
edge of the casing with the inside of the roof and
clamp it into position. Attach it and remove the
clamps (Figure 3-59).
•
Install the outer casing panels by sliding the top
under the roof casing and then swinging the bottom
into the boiler and sliding it down over the bottom
angle. Install all panels in this manner. Panels should
be positioned so that they are centered with equal
lengths of uncovered area at the ends (Figure 3-60).
•
Push the panels together and fix screws to the bot-
tom outside corners of the panels to ensure that they
do not move laterally.
•
Secure the roof casing with the self tapping screws,
at each end and with one in the center of the top
frame outer casing.
•
Position the corner casings and secure them to the
end walls and roof casing (Figure 3-61).
Figure 3-59. Top Frame of Outer Casing
Figure 3-60. Outer Casing Panels
Figure 3-61. Attaching corner casings
Summary of Contents for FLE
Page 1: ...Model FLE Assembly Instructions 750 192 07 09 Field Erectable Flexible Watertube Boiler ...
Page 4: ...iv Notes ...
Page 8: ...viii ...
Page 16: ...General Description Model FLE Assembly 1 8 750 192 ...
Page 34: ...3 2 750 192 Figure 3 1 Typical Hot Water Flextube Casing ...
Page 36: ...3 4 750 192 Figure 3 2 Typical Low Pressure Steam Flextube Casing ...
Page 38: ...3 6 750 192 Figure 3 3 Typical High Pressure Steam Flextube Casing ...
Page 56: ...Casing Assembly Model FLE Assembly 3 24 750 192 ...
Page 58: ...750 192 4 2 Figure 4 2 Fuel Train Components ...
Page 60: ...4 4 750 192 Figure 4 5 Typical conduit layout ProFire burner on a hot water Flextube boiler ...
Page 61: ...750 192 4 5 Figure 4 6 Typical conduit layout ProFire burner on a steam Flextube boiler ...
Page 62: ...4 6 750 192 Figure 4 7 Nameplate locations hot water boiler ...
Page 63: ...750 192 4 7 Figure 4 8 Nameplate locations steam boiler ...
Page 64: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com ...