
Inspecting the Boiler Installation:
NOTICE:
The boiler installation should be inspected by qualified personnel before it is
operated to ensure all state and local codes are followed.
BOILER INSTALLATION
CAUTION:
Omitting or deviating from installation instructions in this manual may
create hazardous operating conditions and void your warranty.
(1) Confirm all clearances from combustibles as well as clearances for service are followed.
(2) Make sure the microprocessor boiler control settings are correct for the application, and
record all temperature settings and optional functions.
(3) If the boiler is installed in a tight enclosed room, make sure there is enough make-up air for
proper ventilation and combustion air (refer to figure 22).
CAUTION:
If the boiler is unattended during extremely cold weather and there is a
component failure or power outage, frozen plumbing and water damage may occur in a
short time. Equip the system so that it senses low temperature and initiates an effective
action. Contact your local heating contractor for assistance.
Figure 22: Louvers for Proper Ventilation and Combustion Air
25
WARNING:
Failure to supply adequate combustion air to the boiler will create unsafe
operating conditions.
(4) After the system has run through a complete cycle, check all fittings for leaks.
(5) Make sure the pressure relief valve and water feed system work properly.
(6) Leave the Owner’s Manual and boiler control manual near the boiler for future reference.
CE70094
12"
12"
LOUVERS FOR
VENTILATION AND
COMBUSTION AIR
Summary of Contents for CE-340
Page 2: ...7 3 13 Part 70006 Underwriters Laboratories File MH48829 ...
Page 35: ...BOILER DIMENSIONS 35 57 5 42 5 67 with Burner 34 0 CE70077 50 ...
Page 40: ...40 1 4 12 6 15 9 10 14 3 2 11 5 13 8 7 Nozzle Adapter Heater Block Assembly ...
Page 42: ...42 2 5 7 6 4 5 3 12 11 9 8 10 1 CE70058 CE 4 Manifold Block Assembly ...