
12
5. Lower the rack securing collar (8) over the column until it rests over the top
of the rack. Position the table support in the same direction as the base.
Fix the rack securing collar (8) in place with the set-screw.
6. Install the table (5) on its support bracket & tighten the table lock handle
(4).
DRILL PRESS HEAD TO COLUMN (FIG 3)
CAUTION: The drill press head is heavy. To avoid injury, two people should lift it
into position.
1. Carefully lift the drill press head
assembly (1) and position it with its
mounting opening (3) over the
top of the column (2). Swivel the
assembly to ensure it is seated
properly on the column.
2. Align the direction of the drill press
head with the direction of the
base and the table.
3. Tighten the set screw (4) using a
hexagon key.
FEED HANDLES (FIG 4)
1. Screw the three feed handles (1)
into the threaded holes in the
feed hub (2) and tighten by hand.
Note: When using the drill, one or
two of the feed handles may
be removed if an unusually-
shaped workpiece interferes
with handle rotation.
Summary of Contents for Metalworker CDP350V
Page 26: ...26 TROUBLESHOOTING ...
Page 29: ...29 PARTS DIAGRAM ...
Page 30: ...30 PARTS DIAGRAM ...
Page 32: ...32 PARTS LIST ...
Page 34: ...34 DECLARATION OF CONFORMITY ...
Page 36: ......