7
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
ASSEMBLY
1. Bolt the main frame to the axle
frame using M8 x 70mm bolts &
nuts supplied.
2. Bolt the support stand to the main
frame using M8 x 70mm bolts and
nuts. (
Fixings packs B and C
)
3. Slide the flat washers onto the
axles, followed by a wheel and a
second flat washer.
4. Insert the split pins in to the holes in
each axle. Bend the ends of the
split pins backward to secure
them. (
Fixings pack A
)
5. Slide the bearing blocks onto the
pivot shafts. Use the 42 dia rubber
ring at the drive end and note
which way round the block should
fit. (
Fixing pack D
) With the help of
an assistant if required, lift the
lower drum assembly into position
on the main frame.
6. Secure the two bearing housings
to the main frame using M8 x
65mm bolts & nuts. (
Fixing pack D
)
• One includes the drive spindle
and spur gear to drive the
mixer. This assembly must be
fitted to the end of the mixer
where the drive assembly will
be fitted this will be the end of
the mixer with the wheels.
Summary of Contents for 3400841
Page 16: ......