  Once the electrical connection is complete, connect the 

battery:  

o

  Red cable to the terminal 

+

 

o

  Blue cable to the terminal 

-

 

  Open the isolating valve on the bypass directly after 

connecting the battery. The turbine will start to run and 
the differential pressure controller will start to regulate. 

  Check that the LED flashes either red or green. The first 

minute is the Turbine Check Cycle where the solenoid 
discharges to atmosphere two times (see here below). 

  Check that the e-Power IP is powering the desired 

electronic devices. 

  Close the electrical box with the 6 screws provides. 

  The e-Power IP is commissioned and ready to be used. 

 

Une fois le raccord électrique terminé, connectez 
l’accumulateur :  

o

 

Fil rouge à la borne + 

o

 

Fil bleu à la borne - 

 

Ouvrir le robinet du by-pass directement après avoir 
connecté l’accumulateur. La turbine va se mettre à 
tourner et le contrôle de différentielle de pression se met 
à réguler. 

 

Vérifiez que la LED clignote soit rouge soit vert. La 
première minute est le Turbine Check Cycle, 
l’électrovanne va donc décharger à l’atmosphère 2 fois 
dans le cycle (voir ci-dessous). 

 

Vérifiez que votre équipement électrique soit alimenté. 

 

Fermez le coffret électrique à l’aide des 6 vis. 

 

La e-Power IP est mise en service et prête à l’emploi.

 

 
 

 

How do you check if the e-Power IP run properly ?

 

Comment vérifier le bon fonctionnement de la e-Power IP ? 

 IMPORTANT SAFETY PRECAUTION! 

 
Always connect the battery before opening the isolating 
valve on the bypass. 
 

 CONSIGNES DE SECURITE IMPORTANTES! 

 

Veuillez toujours connecter l’accumulateur avant d’ouvrir le 
robinet du by-pass. 

  Connect the battery. 

  Open the isolating valve on the bypass. 

  Measure the AC voltage during the Turbine Check Cycle 

as illustrated on the next page. The AC voltage depend 
on the battery charge level. 

 At the end of the cycle, the turbine starts or not 

depending the battery voltage. Threshold at 12 V. 

  To reset and restart the Turbine Check Cycle, reconnect 

the battery. 

 Connectez 

l’accumulateur. 

  Ouvrez le robinet du by-pass. 

  Mesurez la tension alternative de la turbine pendant le 

Turbine Check Cycle comme illustré à la page suivante. 
Suivant la consommation électrique, la tension 
alternative peut varier. 

 Une fois le cycle terminé, suivant la tension de 

l’accumulateur, la turbine va démarrer ou non. Transition 
à 12 V. 

  Pour initialiser et redémarrer le Turbine Check Cycle, 

reconnectez l’accumulateur. 

 

 

 

Turbine OFF 

Turbine arrêtée 

Turbine OFF 

Turbine arrêtée 

Turbine ON 

Turbine en rotation 

Turbine ON 

Turbine en rotation 

Summary of Contents for e-Power IP

Page 1: ...urbine Power 14 W Voltage 12 V and 24 V CLA VAL Europe www cla val ch cla val cla val ch 1 LIN036UE 10 13 Copyright CLA VAL Europe Specifications subject to change without notice no contractual illust...

Page 2: ...2 e Power Ip properties 5 2 1 Performance 5 2 2 Description 6 2 3 Technical Data 8 2 4 PCB 9 2 5 Battery Properties 10 2 6 Battery Alarm 10 3 Commissioning 10 3 1 Mounting Instructions 10 3 2 Quick S...

Page 3: ...ing valve on the valve bypass before connecting the battery to the PCB 1 3 DIAGNOSTIC FOR THE LED The LED is located on the PCB in the electrical box 1 4 GENERAL DISCLAIMER In accordance with our poli...

Page 4: ...V V V V V V V V I I I V P I V P P P I V P The electric current on the load is 2x higher at at 12V than at 24 V for the same power Power balance Power balance Power generated Power supplied plied plied...

Page 5: ...e battery delivers the following output voltage current and power Output voltages Amps continous 60 min h Amps peak 1 min h 12 V 1 16 A 14 W 5 A 60 W 24 V step up 0 58 A 14 W 2 0 A 48 W The electrical...

Page 6: ...cations subject to change without notice no contractual illustrations 2 2 DESCRIPTION Electrical box factory supplied Silicat gel crystal sachet Wall mounting kit Quick Start Instructions No LIN036ST...

Page 7: ...erator Filter for solenoid Terminal for the solenoid and the cable to the electrical box do not attempt to open the product as this will invalidate the warranty Hydraulic output Differential pressure...

Page 8: ...1 min h 5 A 60 W Output 24 VDC step up A continuous 60 min h 0 58 A 14 W A high peak 1 min h 2 5 A 60 W Battery alarm output Dry contact switch Operating display Charging LED flashes red Discharging L...

Page 9: ...rt Instruction LIN036ST in the Annex Terminal Turbine 2 option Terminal No Code Function Color 1 L1 Phase 1 Black 2 L2 Phase 2 Brown 3 L3 Phase 3 Grey 4 No connection Terminal Turbine 1 Terminal No Co...

Page 10: ...standard 12 V 7 0 Ah option 2 6 BATTERY ALARM The dry contact battery alarm on connections 5 and 6 of terminal 3 allows transmission via a SCADA system The dry contact is closed when the battery volt...

Page 11: ...RE 4 1 INSTALLATION OF DRIVER USB Refer to the driver USB installation manual LIN006UE 4 2 SOFTWARE FIRMWARE UPDATE For Software updates please refer to our web site www cla val ch a Select Download b...

Page 12: ...ecommended not to change the values Factory Values according the table below Otherwise the proper use of the e Power IP cannot be guaranteed When the computer connection cable to the PCB is disconnect...

Page 13: ...scharging current Automatic Start turbine Low Battery Level V Low level battery Used to restart the turbine 12 0 V Default value Start Temporisation High Battery level V High battery level is used to...

Page 14: ...cording to the battery capacity 3 Click Write parameters 4 The battery capacity change is completed 4 7 FORCED CHARGE MODIFICATION The forced charge period can be modified to allow for periods where t...

Page 15: ...your power balance is positive b If the turbine provides no AC voltage please follow the point 3 below 3 Close the bypass ball valve disconnect the 2 removable terminals at the same time by pulling wi...

Page 16: ...n the system by disconnecting the wires connected to the battery 4 Unscrew the 4 nuts for the fixing of the battery 5 Replace the battery 6 Screw the 4 nuts to fix the new battery Don t screw the batt...

Page 17: ...ntion to its orientation during the assembly The diaphragm is drilled to allow the water to pass through Please align the hole drilled in the body the hole drilled in the cover and the hole in the dia...

Page 18: ...vous que le robinet du by pass soit ferm pour arr ter la turbine L accumulateur doit tre d connect La LED sur la carte lectronique ne doit pas clignoter Output voltage 12 VDC Terminal 1 12 VDC and te...

Page 19: ...ment Fermez le coffret lectrique l aide des 6 vis La e Power IP est mise en service et pr te l emploi How do you check if the e Power IP run properly Comment v rifier le bon fonctionnement de la e Pow...

Page 20: ...noid connector using a screwdriver Enlevez le connecteur de l lectrovanne l aide d un tournevis croix Switch the solenoid with a 9 V 6LR61 battery like the picture to engage the turbine Commutez l lec...

Page 21: ...onna tre la puissance d livr e par votre e Power IP afin d valuer votre bilan nerg tique Power consumptions available Consommations lectrique admissibles Horizontal mounting Montage horizontal 16 Watt...