background image

CLA-VAL 

e-Power IP

 

Turbine 

Power: 14 W / Voltage: 12 V and 24 V 

 

CLA-VAL 

Europe 

www.cla-val.ch 

[email protected] 

12

 

-

 

LIN036UE 

-  10/13 

© Copyright CLA-VAL Europe - Specifications subject to change without notice - no contractual illustrations.

 

4.3  FIRMWARE UPDATE (INTERNAL SOFTWARE) 

1. 

Connect the e-Power IP battery, wait 1 minute for the cycle « Turbine Check Cycle » to finish. 

2. 

Connect the e-Power IP to the computer with the USB cable. 

3. 

Double click on the e-Power IP icon to start the program. 

4. 

If the connection with the e-Power IP is successful, the e-Power IP appears in the window. Click on the text. 

 

 

 

 

 

 

 

5. Select 

"Firmware update"

 in 

"Parameters"

, the following window appears : 

 

 

 

 

 

 

6. Click 

"Yes"

. Open the corresponding file « .hex ». 

7. Select 

"Read Parameters"

 to check that the Firmware is updated. 

 

4.4 SOFTWARE 

 All values rated «Default value» are initialized by clicking "

Factory Values

" and then "

Read Parameters

". 

It is strongly recommended not to change the values « Factory Values » according the table below. Otherwise, the proper 
use of the e-Power IP cannot be guaranteed. 

 When the computer connection cable to the PCB is disconnected, the e-Power IP will initialize. The system reads the 

battery voltage. The system goes in charging mode (turbine ON) if the voltage is below 12 V, or in discharging mode (turbine 
OFF) if the voltage is greater than 12 V. 

 Each time you connect the computer to the PCB, please wait until the « Turbine Check Cycle » is complete. Only after 

the cycle is complete can you make the connection with the e-Power IP. 

4.5 SOFTWARE DESCRIPTION 

The description is according to the software picture below. 

DESCRIPTION 

FUNCTION 

FACTORY VALUE 

TYPE OF VALUE 

Temperature (°C) 

Electrical box temperature 

Depends on the environment 

Automatic 

Battery Voltage (V) 

Battery voltage 

Depends on the charging state 

Automatic 

Battery Charging Current (mA) 

Battery charging current 

Depends on the battery charging 
state and the power consumption 
on the output voltage 12 V and  
24 V (0 mA if the turbine don’t 
charge the battery) 
 
 

Automatic 

Summary of Contents for e-Power IP

Page 1: ...urbine Power 14 W Voltage 12 V and 24 V CLA VAL Europe www cla val ch cla val cla val ch 1 LIN036UE 10 13 Copyright CLA VAL Europe Specifications subject to change without notice no contractual illust...

Page 2: ...2 e Power Ip properties 5 2 1 Performance 5 2 2 Description 6 2 3 Technical Data 8 2 4 PCB 9 2 5 Battery Properties 10 2 6 Battery Alarm 10 3 Commissioning 10 3 1 Mounting Instructions 10 3 2 Quick S...

Page 3: ...ing valve on the valve bypass before connecting the battery to the PCB 1 3 DIAGNOSTIC FOR THE LED The LED is located on the PCB in the electrical box 1 4 GENERAL DISCLAIMER In accordance with our poli...

Page 4: ...V V V V V V V V I I I V P I V P P P I V P The electric current on the load is 2x higher at at 12V than at 24 V for the same power Power balance Power balance Power generated Power supplied plied plied...

Page 5: ...e battery delivers the following output voltage current and power Output voltages Amps continous 60 min h Amps peak 1 min h 12 V 1 16 A 14 W 5 A 60 W 24 V step up 0 58 A 14 W 2 0 A 48 W The electrical...

Page 6: ...cations subject to change without notice no contractual illustrations 2 2 DESCRIPTION Electrical box factory supplied Silicat gel crystal sachet Wall mounting kit Quick Start Instructions No LIN036ST...

Page 7: ...erator Filter for solenoid Terminal for the solenoid and the cable to the electrical box do not attempt to open the product as this will invalidate the warranty Hydraulic output Differential pressure...

Page 8: ...1 min h 5 A 60 W Output 24 VDC step up A continuous 60 min h 0 58 A 14 W A high peak 1 min h 2 5 A 60 W Battery alarm output Dry contact switch Operating display Charging LED flashes red Discharging L...

Page 9: ...rt Instruction LIN036ST in the Annex Terminal Turbine 2 option Terminal No Code Function Color 1 L1 Phase 1 Black 2 L2 Phase 2 Brown 3 L3 Phase 3 Grey 4 No connection Terminal Turbine 1 Terminal No Co...

Page 10: ...standard 12 V 7 0 Ah option 2 6 BATTERY ALARM The dry contact battery alarm on connections 5 and 6 of terminal 3 allows transmission via a SCADA system The dry contact is closed when the battery volt...

Page 11: ...RE 4 1 INSTALLATION OF DRIVER USB Refer to the driver USB installation manual LIN006UE 4 2 SOFTWARE FIRMWARE UPDATE For Software updates please refer to our web site www cla val ch a Select Download b...

Page 12: ...ecommended not to change the values Factory Values according the table below Otherwise the proper use of the e Power IP cannot be guaranteed When the computer connection cable to the PCB is disconnect...

Page 13: ...scharging current Automatic Start turbine Low Battery Level V Low level battery Used to restart the turbine 12 0 V Default value Start Temporisation High Battery level V High battery level is used to...

Page 14: ...cording to the battery capacity 3 Click Write parameters 4 The battery capacity change is completed 4 7 FORCED CHARGE MODIFICATION The forced charge period can be modified to allow for periods where t...

Page 15: ...your power balance is positive b If the turbine provides no AC voltage please follow the point 3 below 3 Close the bypass ball valve disconnect the 2 removable terminals at the same time by pulling wi...

Page 16: ...n the system by disconnecting the wires connected to the battery 4 Unscrew the 4 nuts for the fixing of the battery 5 Replace the battery 6 Screw the 4 nuts to fix the new battery Don t screw the batt...

Page 17: ...ntion to its orientation during the assembly The diaphragm is drilled to allow the water to pass through Please align the hole drilled in the body the hole drilled in the cover and the hole in the dia...

Page 18: ...vous que le robinet du by pass soit ferm pour arr ter la turbine L accumulateur doit tre d connect La LED sur la carte lectronique ne doit pas clignoter Output voltage 12 VDC Terminal 1 12 VDC and te...

Page 19: ...ment Fermez le coffret lectrique l aide des 6 vis La e Power IP est mise en service et pr te l emploi How do you check if the e Power IP run properly Comment v rifier le bon fonctionnement de la e Pow...

Page 20: ...noid connector using a screwdriver Enlevez le connecteur de l lectrovanne l aide d un tournevis croix Switch the solenoid with a 9 V 6LR61 battery like the picture to engage the turbine Commutez l lec...

Page 21: ...onna tre la puissance d livr e par votre e Power IP afin d valuer votre bilan nerg tique Power consumptions available Consommations lectrique admissibles Horizontal mounting Montage horizontal 16 Watt...

Reviews: