CLA-VAL
e-Power IP
Turbine
Power: 14 W / Voltage: 12 V and 24 V
CLA-VAL
Europe
www.cla-val.ch
14
-
LIN036UE
- 10/13
© Copyright CLA-VAL Europe - Specifications subject to change without notice - no contractual illustrations.
4.6 CHANGING THE BATTERY CAPACITY
To install a new battery for your e-Power IP system, please follow the procedure to change the battery capacity with the help
of the software.
The charging time changes according to the battery capacity.
1.
Click on the dropdown menu "
Battery Capacity (Ah)
".
2.
In the dropdown menu, choose according to the battery capacity.
3. Click
"
Write parameters
".
4.
The battery capacity change is completed.
4.7 FORCED CHARGE MODIFICATION
The forced charge period can be modified to allow for periods where there is no water or poor differential pressure.
Factory default settings are at 5 AM and 5 PM.
4.8 MANUAL TURBINE OPERATION
Two dropdown window s allow either a ‘0’ or ’1’ command to allow manual switching of the solenoid to start/stop the turbine
and also the « Alarm Battery Level (V) » dry contact.
The dropdown menu « Relay » enables a switch to the dry contact position« Alarm Battery Level (V) ».
The dropdown menu "Turbine Stopped" enables the solenoid to start the turbine (= 1 to activate the turbine).
Do not click "
Dynamic reading
" while using the manual operations.