Civemasa Implementos Agrícolas
STAC M 500
39
Important data
Calculation of hourly income
NOTE
To calculate the plow income, use the following calculation:
R = L x V x E
X
Where:
R = Hourly income;
L = Plow working width (meters);
V = Average speed of the tractor (meters per hour);
E = Efficiency: 0.90;
X = Hectare value = 10,000 m².
Example for STAC M 500 (7 shanks):
R = ?
L = 2.80 m
V = 5,000 m/h
E = 0.90
X = 10,000 m²
R = 2.80 x 5,000 x 0.90
10,000
R = 1.26 hectare per hour.
The effective cutting width corresponds to the distance between the end
shanks sumed up with a spacing. Thus, the distance between two passes is
being considered.
Summary of Contents for STAC M 500
Page 1: ...OPERATOR S MANUAL STAC M 500 STAC M 500...
Page 45: ...www civemasa com br...