Page 30
S6162-BS-MMC-010/12489
INSTRUCTIONS FOR ALIGNING BASKET ON CISSELL 50 LB. DRYER -
D O U B L E M O T O R
1. Loosen the 4 gear reducer mounting bolts (1, 2, 3 & 4) on rear of dryer,
and
2
adjusting
bolts
#5,
on
gear
reducer
housing
(Fig.
3).
2. Place one “A” and two “B” diameter pins inside the drying compartment
between the rim of the basket opening and the rim of the door opening in
the positions shown in Figure 1 and Figure 2. Check the two “B” pins for
equal
clearance.
3. With
the
pins
in
position,
tighten
the
two
No.
5
bolts
until
flush
against
back of dryer. Retighten gear reducer mounting bolts in the numerical
order indicated in Figure 3. Tighten lock nuts No. 6 to secure bolts No. 5
in position. Then remove pins.
4. Check the space between basket and door opening at “A” pin and “B” pin
positions (Figure 2). If the gap is not approximately the same on both
sides,
repeat
steps
1,
2
&
3.
NOTE:
Use
short
sections
of
round
steel
rod
for
pins
or
drill
bits
may
be
used
in place
of round
rod.
Summary of Contents for L36TD30ME
Page 10: ...Page 10 S6162 BS MMC 010 12489...
Page 20: ...Page 20 S6162 BS MMC 010 12489 RECOMMENDED STEAM PIPING INSTALLATION ILLUSTRATION...
Page 40: ...Page 40 S6162 BS MMC 010 12489 BACK CHANNEL BOLTED ASSEMBLY TU10600...
Page 50: ...Page 50 S6162 BS MMC 010 12489...
Page 51: ...Page 51 S6162 BS MMC 010 12489...
Page 52: ...Page 52 S6162 BS MMC 010 12489...
Page 53: ...Page 53 S6162 BS MMC 010 12489...