Page 4
TESTING
The Cissell Gear Cabinets are manufactured and tested to the highest standards.
This Gear Cabinet has been tested in the Cissell factory to determine that it is safe and in working
order.
This Gear Cabinet has been tested to UL and CSA standards.
GEAR PREPERATION
The gear should be washed separatley ,
DO NOT WASH LINER AND SHELL TOGATHER!
The gear
should not
be re-assembled before hanging in the cabinet.
The unit will dry two complete sets of gear at one time (shells and liners), plus boots or gloves. The
grear should be staggered, liner, shell , liner, shell, etc.
Summary of Contents for Gear Cabinet
Page 11: ...Page 11 MAIN ASSEMBLY...
Page 16: ...Page 16 WIRING SCHEMATIC AGC65 240V 50 60 3...
Page 17: ...Page 17 WIRING SCHEMATIC AGC64 240V 50 60 1...
Page 18: ...Page 18 WIRING SCHEMATIC AGC45 208V 60 3...
Page 19: ...Page 19 WIRING SCHEMATIC AGC44 208V 60 1...
Page 20: ...Page 20 LADDER DIAGRAM AGC65 240V 50 60 3...
Page 21: ...Page 21 LADDER DIAGRAM AGC64 240V 50 60 1...
Page 22: ...Page 22 LADDER DIAGRAM AGC45 208 60 3...
Page 23: ...Page 23 LADDER DIAGRAM AGC44 208 60 1...
Page 24: ...Page 24...