Figure 20: Gathering Power Cables
What to do next
Attach the remaining cable management arms. See
Installing the Ground Bracket and Bottom Cable
Installing the Ground Bracket and Bottom Cable Management Arms
The cable management for the bottom set of PSUs installs on top of a ground bracket that provides earth
grounding for the chassis. The bottom cable management is installed indirectly, by attaching to the grounding
bracket. The grounding bracket, in is the part that installs onto the chassis for the bottom three PSUs.
In this topic, top and bottom refer to the location on the chassis. Cable management arms are interchangeable,
so there is no specific top and bottom cable arm.
Note
For the additional ground requirements, see
Earth Ground Considerations, on page 21
.
Attach the ground bracket and bottom cable management arms to the chassis.
a) Align the long side of the ground bracket with the threaded standoff on the chassis.
The earth ground symbol on the side of the chassis indicates the correct location for attaching the ground
bracket.
Note
b) Align the captive screws in the cable management sheetmetal with the threaded standoffs on the chassis.
Cisco UCS X9508 Server Chassis Installation Guide
39
Installation
Installing the Ground Bracket and Bottom Cable Management Arms
Summary of Contents for UCS X9508
Page 6: ...Cisco UCS X9508 Server Chassis Installation Guide vi Contents ...
Page 26: ...Cisco UCS X9508 Server Chassis Installation Guide 18 Overview Interpreting LEDs ...
Page 31: ...Cisco UCS X9508 Server Chassis Installation Guide 23 Installation Handling the Chassis ...
Page 64: ...Cisco UCS X9508 Server Chassis Installation Guide 56 Installation Repacking the Chassis ...
Page 124: ...Cisco UCS X9508 Server Chassis Installation Guide 116 Technical Specifications Switzerland ...