C H A P T E R
7
Site Planning and Maintenance Records
•
Site Preparation Checklist, on page 57
•
Contact and Site Information, on page 59
•
Chassis and Module Information, on page 60
Site Preparation Checklist
Planning the location and layout of your equipment is essential for successful system operation, ventilation,
and accessibility.
Consider heat dissipation when sizing the air-conditioning requirements for an installation.
Table 15: Site Planning Checklist
Date
Time
Verified By
Planning Activity
Task No.
Space evaluation:
• Space and
layout
• Floor covering
• Impact and
vibration
• Lighting
• Maintenance
access
1
Cisco UCS 6400 Series Fabric Interconnect Hardware Installation Guide
57