Planning Activity
Task No.
Cable and interface
equipment
evaluation:
• Cable type
• Connector type
• Cable distance
limitations
• Interface
equipment
(transceivers)
5
EMI evaluation:
• Distance
limitations for
signaling
• Site wiring
• RFI levels
6
4
Verify that the power supply installed in the chassis has a dedicated AC source circuit.
5
UPS = uninterruptible power supply.
6
EMI = electromagnetic interference.
7
RFI = radio frequency interference.
Contact and Site Information
Use the following worksheet to record contact and site information.
Table 16: Contact and Site Information
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
Cisco UCS 6400 Series Fabric Interconnect Hardware Installation Guide
59
Site Planning and Maintenance Records
Contact and Site Information