Installing and Cabling the Displays
© 2015 Cisco Systems, Inc. All rights reserved.
Page 83
8
Level the displays and and make the left and right displays vertically level with the center display. Use
the left and right levelers to create an even gap between the left and center, and center and right,
displays. Use a 6mm T-handle hex driver to turn the leveler from below (it has a socket in the end of the
threaded stud). Tighten the lock nut on the levelers after you complete leveling.
Leveler
Leveling
bracket
View from back - use a 6mm T-handle
hex driver from below to adjust levelers
Summary of Contents for TelePresence IX5000
Page 71: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 71 ...
Page 72: ...Installing Endpoint Structure Cables Page 72 2015 Cisco Systems Inc All rights reserved ...
Page 185: ...Cable Routing Diagrams 2015 Cisco Systems Inc All rights reserved Page 185 ...
Page 186: ...Cable Routing Diagrams Page 186 2015 Cisco Systems Inc All rights reserved ...