Installing the Outer Structure Panels and Trim
© 2015 Cisco Systems, Inc. All rights reserved.
Page 171
11a
Install the top fascia
74-12905-xx.
Use two people and wear the gloves that are included with the
accessory kit for this procedure.
a.
Begin to unfold, but do not fully unfold, the top fascia. Align the
camera cutout in the fascia with the camera, and place the top fascia over the camera. Engage the alignment
lip of the fascia to the receiving slots above the center display, and make sure that the magnets connect the
fascia to the frame.
b.
Align the top fascia vertically. The upper lip of the top fascia rests in the sheet metal
shelf in the display frame that is created by the horizontal cross bars.
Table Top B
(700-42476-01)
Table Top A
(700-42477-01)
Table Top C
(700-42478-01)
Frame shelf
74-12905-xx
Summary of Contents for TelePresence IX5000
Page 71: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 71 ...
Page 72: ...Installing Endpoint Structure Cables Page 72 2015 Cisco Systems Inc All rights reserved ...
Page 185: ...Cable Routing Diagrams 2015 Cisco Systems Inc All rights reserved Page 185 ...
Page 186: ...Cable Routing Diagrams Page 186 2015 Cisco Systems Inc All rights reserved ...