Installing and Cabling the Displays
Page 76
© 2015 Cisco Systems, Inc. All rights reserved.
3
Insert the spool on the right display.
a.
remove one M8 screw on the lower right side (when viewed
from the FRONT) of the display using a #3 Phillips driver.
b.
Install a silver M8 lock washer (part of 69-
2625-xx) and an M8 stud (part of 69-2625-xx).
c.
Tighten the stud with a 13mm wrench.
d.
Install the spool
(part of 69-2625-xx) on the threaded stud.
d.
MAKE SURE THAT THERE IS is 1 1/8 inch (29mm) distance
between the spool and the rear of the display or you cannot install the display.
69-2625-xx
1 1/8” (29 mm)
Summary of Contents for TelePresence IX5000
Page 71: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 71 ...
Page 72: ...Installing Endpoint Structure Cables Page 72 2015 Cisco Systems Inc All rights reserved ...
Page 185: ...Cable Routing Diagrams 2015 Cisco Systems Inc All rights reserved Page 185 ...
Page 186: ...Cable Routing Diagrams Page 186 2015 Cisco Systems Inc All rights reserved ...