This server can weigh up to 67 pounds (59 kilograms) when fully loaded with components. We recommend
that you use a minimum of two people or a mechanical lift when lifting the server. Attempting this procedure
alone could result in personal injury or equipment damage.
Caution
Figure 7: Inner Rail Release Clip
Outer rail attached to rack post
3
Inner rail release clip
1
Inner rail attached to server and inserted into outer
rail
2
Step 5
(Optional) Secure the server in the rack more permanently by using the two screws that are provided with the slide rails.
Perform this step if you plan to move the rack with servers installed.
With the server fully pushed into the slide rails, open a hinged slam latch lever on the front of the server and insert the
screw through the hole that is under the lever. The screw threads into the static part of the rail on the rack post and
prevents the server from being pulled out. Repeat for the opposite slam latch.
Cisco Identity Services Engine Hardware Installation Guide, Release 2.0.1
18
Install Cisco ISE Software on the SNS 3515 and SNS 3595 Appliances
Install the Cisco SNS 3515 or 3595 Appliance in a Rack