3-52
Cisco ONS 15200 Installation, Setup, and Test Manual
78-13765-01
Chapter 3 Installation
Figure 3-44 100/0 split ratio (unprotected) connections for a CFM
Step 13
Route the CFM MU connectors to the CLIP module area (a CLIP has not yet been installed) through the
opening in the front panel of the SCU (to the left of the LED-panel).
Step 14
Align the rear collector cover with its retaining screws.
Step 15
Install the rear collector cover.
Step 16
Use a slot or Phillips screwdriver to tighten the rear collector cover retaining screws.
Step 17
Align the CFM access lid with the rear collector cover retaining screws.
Step 18
Install the CFM access lid by pushing down on the lid and sliding it to the left.
Step 19
Use a slot or posidrive screwdriver to tighten the CFM access lid retaining screws.
Procedure: Install the Client Layer Interface Port Module
Step 1
Align the CLIP module with the CLIP module slot in the ONS 15201 SCU.
Step 2
Carefully insert the CLIP module in the slot. Be sure the CLIP module connector and the backplane
connector mate correctly and that no fibers are pinched.
Step 3
Tighten the CLIP module thumbscrews.
Step 4
Remove the MU dust cap from one of the MU connectors on the CFM.
Step 5
One at a time, remove the dust plugs from the CLIP module optical-fiber adapter, starting with the
receivers.
Step 6
Clean and inspect the connectors on the fiber.
Step 7
Connect the fiber to the CLIP module optical connectors in accordance with the labels located on the
cables, starting with the receivers.
SC
MU
Fusion splice
Side A
Side B
IN
IN
OUT
OUT
Rx B (not used)
Rx A
Tx
CLIP
1
4
3
2
A
54897