Step 5
Install a grounding cable between the left hand side door for the I/O modules and the switch chassis, as shown
in
. Repeat the procedure for installing a grounding cable between the right hand side door for the
I/O modules and the switch chassis.
Figure 15: Grounding Cable Location between the Left Hand Side Door for the I/O Modules and the Cisco Nexus 7718
Switch Chassis
The grounding cable location for installing the grounding cable between the right hand side door for
the I/O modules and the Cisco Nexus 7718 switch chassis will be mirrored on the right hand side of
the switch.
Note
M4 screw
2
Grounding cable
1
Cisco Nexus 7718 Switch Site Preparation and Hardware Installation Guide
OL-30453-01
39
Installing the Chassis
Grounding the Front ID Doors