b) Secure the air filter to the cable management frame using five M3 x 13 mm screws and tighten to 5 to 7
in-lb (0.56 to 0.79 N·m) of torque.
c) Repeat Steps 2a and 2b to attach the remaining cable-management air filter.
Cisco Nexus 7718 Switch Site Preparation and Hardware Installation Guide
52
OL-30453-01
Installing the Chassis
Installing the Air Filters