2-9
Cisco Network Convergence System 6000 Series Routers Unpacking, Moving, and Securing Guide
OL-29233-01
Chapter 2
Attaching the Dolly to the Chassis and Removing the Chassis Pallet
Note
The brackets are labeled as left or right (viewed from the front and rear).
Figure 2-8
Lift Brackets and Bolts
Step 4
Attach lift brackets to the chassis using the M10 x 25 mm screws (
Figure 2-8
). Align and insert the side
pins of the lift bracket to the lower left side of the front side of the chassis. Repeat this step with the right
lift bracket on the lower right side of the front side of the chassis.
Figure 2-9
shows the oblique view of
attaching the lift brackets to the chassis.
1
From left to right—left front and right
front lift brackets
6
Hole for M10 x 25 mm socket-head cap screw
2
Side pins on each lift bracket (inserted into
the chassis)
7
Left front
3
From left to right—Right rear and left rear
lift brackets
8
Right rear
4
Eight M14 x 30 mm socket-head cap
screws (used to bolt the front and rear lift
brackets to the dolly)
9
Right front
5
Four M10 x 25 mm socket-head cap screws
(used to bolt the front and rear lift brackets
to the chassis)
10
Left rear
3
0
3
655
1
2
6
6
3
2
6
8
2
2
1
3
5
4
10
9
7