5-90
Cisco MGX 8800/8900 Series Hardware Installation Guide
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006
Chapter 5
Installing the Cisco MGX Switch or Gateway
Installing the MGX 8950 Switch
The CP connection can also be set up through a terminal server, as shown in
Figure 5-56
.
Figure 5-56
Terminal Server Connection to the Console Port
For further information about server management and configuration setup, refer to the appropriate
software configuration guide for your switch and your release.
Connect Power to the MGX 8950 Switch
The section provides the following installation procedures for connecting power to the switch:
•
“Connect AC Power to the Switch” section on page 5-91
•
“Connect DC Power to the Switch” section on page 5-93
Warning
Never install an AC power module and a DC power module in the same chassis.
Statement 264
Table 5-6
Terminal Settings
Setting
Value
Baud rate
9600 bps
Character size
8 data bits
Parity
None
Stop bits
1
Hardware flow control
None
PXM
UI-S3
C
P
M
P
A
L
1
N
L
2
N
A
L
A
A
R
M
E
X
T
C
L
K
1
E
X
T
C
L
K
2
44371
PXM-UI-S3
back card
Workstation
Terminal server
Serial cable
Serial, LAN,
or dial-up
connection