Contents
13
Cisco MGX 8800/8900 Series Hardware Installation Guide
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006
Connect the Alarms
130
Connect the MP Connection
131
Connect the LAN1/2 Ports
132
Verify EMI Compliance
132
Installing the Ferrite Bead on the PXM-UI-S3/B Card
133
How to Install the Ferrite Bead
133
Installing the Ferrite Bead on Ribbon Connectors
135
Install the Ferrite Bead
135
First Time Power On Procedure for MGX Switches
137
Prerequisites
137
Tools Required
137
General Power On Sequence and Checkout
138
Specific Power On Sequence and Checkout
138
C H A P T E R
6
Maintaining the Cisco MGX Switch or Gateway
1
Swapping a Primary or Redundant DC Power Entry Module with Power On
2
Removing and Installing the Double-Height Front Cards
4
Remove the Double-Height Front Cards
5
How Most Card Levers Work
5
How VXSM Card Levers Work
5
Install the Double-Height Front Cards
7
Removing and Installing the Single-Height Front Cards
8
Remove the Single-Height Front Cards
8
Install the Single-Height Front Cards
9
Removing and Installing the Back Cards
9
Remove the Back Cards
10
Install the Back Cards
11
Removing and Installing Back Card Transceivers
12
Remove the Back Card Transceivers
12
Install the Back Card Transceivers
13
Replacing the Air Intake Plenum Filter
13
Scheduled Maintenance of the Air Filter
14
Replacing the Filter
14
Removing the Center Guide Modules
14
Connecting the Back Cards to the APS Connector
17
Installing the APS Assembly in the Switch
19
Removing the Back Cards from an APS Assembly
21
Replacing Processor Cards
21