11-11
Cisco BPX 8600 Series Installation and Configuration
Release 9.3.0, Part Number 78-10674-01 Rev. D0, July 2001
Chapter 11 Installing the AC Shelf
AC Power Input Connections
Figure 11-9
AC Power Supply Connections (Dual and Single Versions Shown)
Step 4
The ground (green/yellow) wire of the AC power cord provides the safety ground to the BPX switch
via the grounding prong on the three-prong connectors. Make sure the building AC receptacle is also
properly grounded (see Figure 11-10).
POWER CORD RETAINER
CB1-B
AC In B
JI-B
COVER
CB1-A
AC In A
JI-A
POWER CORD RETAINER
CB1-B
AC In B
H8003
JI-B
COVER
Summary of Contents for BPX 8600 Series
Page 43: ...P A R T 1 The BPX Switch ...
Page 44: ......
Page 151: ...P A R T 2 Installation ...
Page 152: ......
Page 261: ...P A R T 3 Initial Configuration and Network Management ...
Page 262: ......
Page 291: ...P A R T 4 Configuring Connections ...
Page 292: ......
Page 481: ...P A R T 5 Troubleshooting and Maintenance ...
Page 482: ......
Page 531: ...P A R T 6 BPX Specifications ...
Page 532: ......
Page 563: ...P A R T 7 Appendices ...
Page 564: ......