C
IRRUS
D
ESIGN
S
ECTION
3: E
MERGENCY
P
ROCEDURES
SR20
A
IRSTART
P/N 11934-005
3-11
Airstart
Engine Airstart
1. BAT 1 and BAT 2 Switches ..................................................................... ON
2. Power Lever .......................................................................... OPEN ½ INCH
3. Mixture...............................................................................RICH, AS REQ’D
4. Fuel Selector...................................................................... SWITCH TANKS
5. Ignition Switch .....................................................................................BOTH
6. Fuel Pump.................................................................................................. ON
7. Alternate Induction Air ........................................................................... ON
8. ALT 1 and ALT 2 Switches.....................................................................OFF
9. Starter (Propeller not Windmilling) ........................................... ENGAGE
10.Power Lever ............................................................... SLOWLY INCREASE
11.ALT 1 and ALT 2 Switches...................................................................... ON
12.CHTs and Oil Temperature .. WARM ENGINE AT PARTIAL POWER
IF REQUIRED
13.If engine will not start, perform
Check-
list.
Procedure Complete
• N
OTE
•
Switching tanks and turning the fuel pump on will enhance
starting if fuel contamination was the cause of the failure. Leaning
the mixture and then slowly enriching mixture may correct faulty
mixture control.
Engine airstarts may be performed during 1g flight anywhere
within the normal operating envelope of the airplane.
Reissue A