6
VLOG-10
Instruction Manual
1�- VERIFICATIONS UPON RECEPTION
The following must be checked upon reception of the device:
a) The device has been supplied according to the specifications in your order.
b) The device has not been damaged during transport.
c) Perform an external visual inspection of the device before connecting it.
d) Check that it has been supplied with the following:
-
An installation guide
- 1 power supply terminal strip
- 1 USB cable
Immediately contact the carrier and/or
CIRCUTOR's
after-sales service if
you detect any problem in the device upon reception.
2�- PRODUCT DESCRIPTION
The
VLOG-10
power quality analyser is a programmable measuring instrument that measures,
calculates and records the mains voltage in its memory. It also monitors the different events that
can occur in a single-phase mains.
The
VLOG-10
records true RMS measurements with the power supply voltage, recording the
results in its internal memory and then uploading them to a PC.
The device features:
- 1 button,
to reset the log memory.
- 3 indicator
LEDS.
-
1
USB
connector, to connect and download data onto a PC.
Summary of Contents for VLOG-10
Page 1: ...INSTRUCTION MANUAL Power quality analyser VLOG 10 M091B01 03 18A...
Page 2: ...2 VLOG 10 Instruction Manual...
Page 25: ...25 Instruction Manual VLOG 10 116 26 43 Figure 21 VLOG 10 dimensions...
Page 27: ...27 Instruction Manual VLOG 10 9 CE CERTIFICATE...
Page 28: ...28 VLOG 10 Instruction Manual...
Page 29: ...29 Instruction Manual VLOG 10...