27
Instruction Manual
MYeBOX 150 - MYeBOX 1500
3�8�8�- SINGLE-PHASE NETWORK MEASUREMENT, PHASE TO NEUTRAL, WITH A
2-WIRE CONNECTION, MYeBOX 150�
Type of installation (Select circuit)
(10)
:
1 Phase + Neutral.
POWER SUPPLY
ALIMENTACI
Ó
N AUXILIAR
U1
L1
N
UN
CARGA / LOAD
I1
eBOX 150
MY
Figure 21: Single-phase measurement, phase to neutral, with a 2-wire connection (MYeBOX 150)�
Note:
See section “
3.8.10.- DETAIL OF THE CURRENT MEASUREMENT CONNECTION.”
(10)
See
Summary of Contents for MYeBOX 150
Page 2: ...2 MYeBOX 150 MYeBOX 1500 Instruction Manual...
Page 90: ...90 MYeBOX 150 MYeBOX 1500 Instruction Manual 14 CE CERTIFICATE...
Page 91: ...91 Instruction Manual MYeBOX 150 MYeBOX 1500...
Page 92: ...92 MYeBOX 150 MYeBOX 1500 Instruction Manual...