INSTALLATION
55
CHAPTER 4: INSTALLATION
PREPARATION FOR USE
1.
Inspect all equipment for damage that may have occurred during
shipment.
Contact Cincinnati Sub-Zero immediately if any shipping
damage is noticed.
2.
Ensure that all packing materials have been removed from all parts.
3.
Read this manual in its entirety.
4.
Select a suitable location for chamber.
a.
A minimum clearance of 12” (31 cm) must be maintained for
proper ventilation around the sides of the chamber. The rear of the
chamber must have at least 30” (70 cm) of clearance for
ventilation. If the unit has the optional up-blast enclosure, no
additional clearance is required behind the unit. Water and
electrical connections should be flexible and be at least 3 ft (92 cm)
long so the unit can be serviced easily.
b.
The chamber must be installed in an environment of 75°F ±10°F
(+23°C±6°C) with a maximum relative humidity of 95% for proper
operation and a maximum elevation of 5000 ft (609.6m).
c.
Units give off between 6,000 (1.76 kw) and 50,000 BTU/HR (14.65
kw) of heat to the room, depending on the unit. There must be a
means of removing this heat to keep the chamber environment
within spec.
d.
Select a suitable location for the chamber. The location must be
smooth and level with a maximum slope in any direction of 1/8” (3
mm) x 10’ (3 m).
e.
Unit lifting points are designated with forklift labels.
f.
Forks should extend passed the other side of the chamber to
prevent damage.
g.
When transporting the chamber, it should be 2”-3” off the floor.
h.
The rear of the chamber is heavier than the front due to the
location of the refrigeration compressors.
5.
To Level Unit:
a.
Leveling feet have been provided at the front of the unit. A 1/2”
(13 mm) open end wrench can be used to extend the leveling feet.
The unit must be level or slightly tilted to the rear for proper water
drainage in the chamber.
b.
If the door is binding, the hinge-side leveling foot must be
extended approximately 1/4” (13 mm) higher than the latch-side
leveling foot.
Only
qualified maintenance
personnel
should be
permitted to perform any
maintenance or installation
procedures.
WARNING
Do not locate system in an
area near flammable or toxic
material. Failure to follow
these instructions may result
in serious personal injury.
WARNING
In moving or relocating the
chamber, never tip the unit
more than 45 degrees
without instructions from
Cincinnati Sub-Zero.
CAUTION
Maximum water inlet
pressure is 10 PSI (69kPa) for
an atomizer and 25 PSI (172
kPa) for a boiler. Exceeding
this pressure may cause
catastrophic failure of the
filter housing.
For optimal use of the
atomizer and boiler systems,
inlet water pressure should
not fall below 10 PSI (69 kPa)
for both boilers and
atomizers.
WARNING
Results may not be
immediate, please wait
several hours before
continuing adjustments.
NOTE
Summary of Contents for ZP Series
Page 1: ...58911 rev B 1 2021 Installation Operation Maintenance Manual ZP Series ...
Page 4: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...CHAMBER LABELS AND MEANINGS ii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 12: ...TABLE OF CONTENTS viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 24: ...GENERAL DESCRIPTION 12 Figure 2 4 Achievable Humidity Points ...
Page 52: ...GENERAL DESCRIPTION 40 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 66: ...OPERATING INSTRUCTIONS 54 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 96: ...MAINTENANCE WITH Q A 84 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 98: ...SERVICE PARTS WARRANTY 86 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 99: ...SYSTEM DIAGRAMS ELECTRICAL SCHEMATIC SYMBOLS Figure 9 1 Symbols Used on Electrical Scematics ...