GENERAL DESCRIPTION
24
Table 2-6: ZP Load Capacity and Electrical Requirements
Tundra® -45°C to 190°
Live Load Capacity
Watts
Electrical Power Requirements
Full Load AMPs
Model
-18° C
-34° C
-40°C
208/230V, 1Ph
208/230V, 3Ph
460V, 3Ph
ZP-8-2-SCT/AC
1800
950
725
31
27
-
ZP-8-3.5-SCT/AC
2110
1100
925
-
37
23
ZP-8-6-SCT/WC
2200
1500
1200
-
46
21
ZP-16-3.5-SCT/AC
3000
1700
1300
-
37
23
ZP-16-6-SCT/WC
3600
2300
1800
-
46
21
ZP-16-10-SCT/WC
4000
2500
2000
-
-
29
ZP-32-3.5-SCT/AC
3000
1700
1300
-
37
23
ZP-32-6-SCT/WC
3600
2300
1800
-
46
21
ZP-32-10-SCT/WC
6000
3500
2300
-
-
29
ZP-32-15-SCT/WC
8000
5000
3000
-
-
35
ZP-44-3.5-SCT/AC
2800
1500
1100
-
37
23
ZP-44-6-SCT/WC
3300
2000
1500
-
46
21
ZP-44-10-SCT/WC
6000
3500
2300
-
-
29
ZP-44-15-SCT/WC
8000
5000
3000
-
-
35
ZP-64-3.5-SCT/AC
2600
1300
800
-
37
23
ZP-64-6-SCT/WC
3100
1800
1300
-
46
21
ZP-64-10-SCT/WC
6000
3500
2300
-
-
29
ZP-64-15-SCT/WC
8000
5000
3000
-
-
35
ZPS-80-3.5-SCT/AC
2600
1300
800
-
37
23
ZPS-80-6-SCT/WC
3100
1800
1300
-
46
21
ZPS-80-10-SCT/WC
6000
3500
2300
-
-
29
ZPS-80-15-SCT/WC
8000
5000
3000
-
-
35
ZP-96-3.5-SCT/AC
2600
1300
800
-
37
23
ZP-96-6-SCT/WC
3100
1800
1300
-
46
21
ZP-96-10-SCT/WC
6000
3500
2300
-
-
29
ZP-96-15-SCT/WC
8000
5000
3000
-
-
35
**Performance is based on 230V, 60
Hz. operation and a 24°C ambient.
For 50 Hz operation, stated
performance and air flow may be
approximately 17% less.
Specifications are subject to change.
**Electrical requirements on
temperature only units. Amperage
may increase on humidity models.
See quotation for actual values.
The performance of your chamber is significantly affected by
the characteristics of your test sample. Factors including size,
material, shape, weight and power dissipation if energized. The
test sample should be placed in the chamber in a manner that
allows proper ventilation. Air flow is from top to bottom in the
chamber. Test samples should be placed on the shelves, not
placed directly on the chamber floor.
Please reference your CSZ quotation as values may vary in
specific chamber performance listed in each chart seen on
pages 14 - 17.
NOTE
Summary of Contents for ZP Series
Page 1: ...58911 rev B 1 2021 Installation Operation Maintenance Manual ZP Series ...
Page 4: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...CHAMBER LABELS AND MEANINGS ii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 12: ...TABLE OF CONTENTS viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 24: ...GENERAL DESCRIPTION 12 Figure 2 4 Achievable Humidity Points ...
Page 52: ...GENERAL DESCRIPTION 40 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 66: ...OPERATING INSTRUCTIONS 54 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 96: ...MAINTENANCE WITH Q A 84 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 98: ...SERVICE PARTS WARRANTY 86 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 99: ...SYSTEM DIAGRAMS ELECTRICAL SCHEMATIC SYMBOLS Figure 9 1 Symbols Used on Electrical Scematics ...