TRANSTIG 220AC/DC AND 300AC/DC POWER SOURCE
INSTALLATION, OPERATION AND SETUP
3-22
Manual 0-5293
In our example we are copying from Job Number 2-9.
•
Press the SAVE button (54).
•
Use the Multi Function Control (24) to select the “destination” job set number and the job
number. In our example we are copying to Job Number 6-7.
•
Press and hold the SAVE button (54) until all LED’s illuminate briefly to indicate a Save has
been completed
.
3.14 Setup for STICK (MMAW) Welding
A. Connect the Electrode Holder lead to the Electrode welding terminal (top). If in doubt, consult the electrode
manufacturer. Welding current flows from the Power Source via heavy duty bayonet type terminals. It is
essential, however, that the male plug is inserted and turned securely to achieve a sound electrical connection.
B. Connect the work lead to the Worklead welding terminal (bottom). If in doubt, consult the electrode
manufacturer. Welding current flows from the power source via heavy duty bayonet type terminals. It is
essential, however, that the male plug is inserted and turned securely to achieve a sound electrical connection.
C. Select STICK and electrode positive mode with the welding mode and welding type buttons (refer to Section
3.15 for further information)
!
WARNING
Before connecting the work clamp to the work and inserting the electrode in the electrode holder
make sure the mains power supply is switched off.
CAUTION
Remove any packaging material prior to use. Do not block the air vents at the front or rear of the
Welding Power Source.
CAUTION
Loose welding terminal connections can cause overheating and result in the male plug being fused
in the bayonet terminal.
Summary of Contents for A-12030
Page 6: ......