CIAS Elettronica S.r.l.
Ed 2.3
Installation manual
Page
67
of
79
IB-SYSTEM-R
3.7.1 Configuration
All the network settings for the FMC-Rep-ETH are set up using the appropriate equipment
software. Connect the network cable and power up the device and if the cable is connected
correctly the yellow link indicator will illuminate (if not, the cable is defective or is not connected at
the other end).
The yellow 100BaseT led will illuminate if the network supports 100Mb/s data transmission.
Install and connect all the FMC-Rep-ETH adaptors required by the system.