CI Systems
SR-800R
8.4
Assembling the System
The sequence in assembling the system is:
Unpacking the Julabo Circulation System and Low-Temperature Blackbody
(see Section
8.4.1
)
Connecting Pipes and Dry Nitrogen to the Low-Temperature Blackbody
(see Section
8.4.2
)
Connecting Pipes to the Julabo Circulation System
(see Section
8.4.3
)
Cable-Connection
(see Section
8.4.4
)
Operation Instructions
(see Section
8.4.5
)
8.4.1
Unpacking the Julabo Circulation System and Low-Temperature
Blackbody
1. Unpack the Julabo Circulation System and place it on site (refer to the
Julabo
Circulation System Operating Manual
).
2. Unpack the Blackbody and place it on site at a distance of up to 4 meters from the
Julabo Circulation System. A general view of the Blackbody packaging is shown
in
Figure 8-2
:
Figure 8-2: Low-Temperature Blackbody Packaging
Blackbody
Packaging
605-7040
Operation
Manual
Rev D
8-6
June 2013
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for ControlMaster SR-800R
Page 17: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 35: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Page 129: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...