Installation and Setup
Mirage 4K25 Setup Guide
15
020-101362-02 Rev. 1 (01-2015)
3. Connect to the terminal block.
• If connecting to permanent power, connect the AC power
source to the terminal block, beginning with the ground
lead.
• If connecting to a pluggable type-B cable, connect the cable
to the terminal block, beginning with the ground lead.
• Use an appropriately sized strain relief connector with the knockout plate provided to
ensure adequate environmental sealing and to prevent the cables from wear and
accidentally being torn out.
4. Reinstall the knockout plate and secure it with four screws.
5. Reinstall the bottom access panel over the terminal block and secure it with two screws.
6. If using a pluggable type-B cable, connect to the building’s AC power source.
i
The terminal block accommodates up to an eight AWG wire.
If required, a 90° strain relief connector can be used to route
the power cable in a downward direction.
Warning!
Failure to comply with the following could result in
death or serious injury.
Always connect the ground lead first to reduce shock hazard.
3