Section 2: Installation and Setup
J Series 2.0, 2.4, and 3.0 kW Setup Guide
2-5
020-100751-03 Rev. 1 (02-2014)
2.1.5 Power up
After the AC Power has been switched on, the LCD display above the keypad indicates “Please wait” and the
4 LED status indicators at the rear of the projector will be solid amber.
The projector has reached standby and is ready for use when:
• The LCD displays “Standby mode”
• The Status LED is solid amber
• The Lamp LED is off
To turn on the projector, do one of the following:
• Press and hold the power button on either the built-in keypad or the remote control
• Press the power button twice (quickly) on either the built-in keypad or the remote control
Thereafter; the lamp and fans will power on and a green LED will start scrolling back and forth indicating that
the projector is in warm up mode.
The projector is on and ready to display video when the lamp LED and the status LED are both solid green.
NOTES: 1)
See
Section 3 Operation
for a full description of the status indicators
.
2)
If the projector has a
stepper motor lens mount installed and the inserted lens has never been calibrated, there will be a short period
where the projector calibrates all of the lens motors (zoom, focus, horizontal, and vertical) by moving them
through their full range of motion.
2.1.6 Select a Source
Press one of the input keys on the remote, or on the built-in keypad to select and display the image for a
connected source.
2.1.7 Adjust the Image
Adjust the image settings, such as Brightness, Contrast, Gamma, Focus, Zoom etc. using the direct keys on the
remote, or on the built-in keypad. See
Section 3 Operation
for more details.
2.2
Detailed Setup and Installation
Always power down the projector and disconnect all power sources before
servicing or cleaning.
In the unlikely event of a lamp explosion, particles may be blown out of the
rear air vents. Keep clear of the exhaust air path during operation. Take
appropriate precautions to shield operators and audience members from lamp
explosion particles.
High leakage current. Earth connection essential before connecting supply.
See the Safety Warnings and Guidelines in
1.2 Safety Warnings and Guidelines
.
2.2.1 Mounting
Summary of Contents for J 2.0 kW
Page 1: ...J Series 2 0 2 4 and 3 0 kW S e t u p G u i d e 020 100751 03 ...
Page 2: ......
Page 3: ...J Series 2 0 2 4 and 3 0 kW S e t u p G u i d e 020 100751 03 ...
Page 10: ......
Page 38: ......
Page 42: ......
Page 43: ......