•
Adjustable wrench
•
Step stool
•
Powder-free N-DEX gloves
•
Clean dry air (CDA)
•
Isopropyl alcohol
•
Cotton swabs
Preparing the installation site
Ensure the installation area is ready for the components.
1. Clear the installation area.
2. Post laser hazard warning signs at all entry doors.
3. Place each component near its installation location.
Adjusting the rigging handles
Roadie 4K40-RGB comes with the rigging handles installed in the landscape position. The handles can
be moved to support other orientations.
1. Ensure the projector is in a secure position.
2. Remove the two screws securing the each handle.
3. If required, flip the projector to the orientation you want it in.
4. Line the two handles over the mounting holes.
5. Install the screws and tighten to a torque of 120 to 150 in-lb.
The following shows the rigging handles installed when the projector is positioned in portrait
orientation.
Installation and setup
4K40-RGB Installation and Setup Guide–D4K40-RGB, Roadie 4K40-RGB
21
020-102961-03 Rev. 1 (08-2019)
Copyright
©
2019 Christie Digital Systems USA, Inc. All rights reserved.