Safety and Operations
Chris-Craft
2–23
Safety Equipment
In the United States the operator of a vessel is responsible for the minimum safety equipment required by
the U.S. Coast Guard. Safety equipment should be maintained on a regular basis and must be stowed where
it is accessible in a reasonable amount of time in an emergency. Some safety equipment must be Coast
Guard approved. “Coast Guard Approved Equipment” has been determined to be in compliance with
USCG specifications and regulations relating to performance, construction or materials.
As the owner/operator, you should always check the safety procedures and/or requirements for the country
of registration as regulations and responsibilities may changed from country to country.
A complete list of required equipment, Federal rules and regulations and other valuable links can be found
on the
United States Coast Guard Boating Safety
web page:
www.uscgboating.org
A Quick Reference Chart of the Federal Requirements for recreational boats can be found at:
http://www.uscgboating.org/safety/fedreqs/equ_refchart.htm
Read and understand all pamphlets and brochures supplied with safety equipment. Become familiar with
how the equipment operates and stow all safety equipment properly.
At a minimum you should have the following safety equipment available (
Table 2-1
):
Table courtesy of the U.S. Coast Guard.
Table 2-1. Minimum Required Safety Equipment
Vessel Length (in Feet)
Equipment
Requirement
16–25
26–39
Life Jackets (PFDs)
(a)
One Type I, II, III, or V wearable PFD for each
person on board. (USCG approved)
(b)
In addition to paragraph (a), must carry One
Type IV (throwable) PFD.
Visual Distress Signal (VDS)
(a)
One electric distress light or Three combination
(day/night) red flares. (Note: only required to be
carried on board when operating between sun-
set and sunrise.)
(b)
One orange distress flag and One electric dis-
tress light - or -Three hand-held or floating
orange smoke signals and One electric distress
light - or - Three combination (day/night) red
flares: hand-held, meteor or parachute type.
Fire Extinguishers
(a)
One B-I (when enclosed compartment)
(b)
One B-II or Two B-I. (Note: Fixed system equals
One B-I.)
(c)
One B-II and One B-I or Three B-I. (Note: Fixed
system equals One B-I or Two B-II.)
Backfire Flame Arrestor
Required on all gasoline engines except
outboard motors.
Navigation Lights
Required to be displayed from sunset to
sunrise and in or near areas of reduced
visibility.
Summary of Contents for Corsair 25
Page 1: ...Cover page...
Page 2: ......
Page 12: ...x Chris Craft List of Tables...
Page 27: ...Safety and Operations Chris Craft 2 7 Figure 2 14 Warning Labels Lancer 20...
Page 28: ...2 8 Chris Craft Safety and Operations Figure 2 15 Warning Labels Lancer 22 Rumble...
Page 29: ...Safety and Operations Chris Craft 2 9 Figure 2 16 Warning Labels Launch 22...
Page 30: ...2 10 Chris Craft Safety and Operations Figure 2 17 Warning Labels Launch 25...
Page 31: ...Safety and Operations Chris Craft 2 11 Figure 2 18 Warning Labels Corsair 25...
Page 32: ...2 12 Chris Craft Safety and Operations Figure 2 19 Warning Labels Launch 28...
Page 33: ...Safety and Operations Chris Craft 2 13 Figure 2 20 Warning Labels Corsair 28...
Page 65: ...Systems Chris Craft 3 3 Figure 3 1 Helm Switch Panel...
Page 88: ...3 26 Chris Craft Systems Figure 3 22 Engine Compartment Blower Switch...
Page 92: ...3 30 Chris Craft Systems Figure 3 25 Trim Tab Control Switches...
Page 116: ...3 54 Chris Craft Systems...
Page 122: ...4 6 Chris Craft Storage and Commissioning...
Page 132: ...B 2 Chris Craft Checklist...
Page 140: ...C 2 Chris Craft Coast Guard Accident Report...
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 146: ...D 2 Chris Craft Float Plan...
Page 147: ......
Page 148: ......
Page 154: ...E 6 Chris Craft Trailering...
Page 158: ...G 2 Chris Craft Maintenance Log Forms...
Page 159: ......
Page 160: ......
Page 162: ...H 2 Chris Craft Technical Drawings...
Page 163: ...nd Fuel Routing BATTERY FUEL VENT HOSE FUEL FILL LINE SENDING UNIT...
Page 164: ......
Page 166: ......
Page 168: ......
Page 169: ...ull Locations RBOARD DRAIN UG AL ANCHOR LOCKER DRAIN...
Page 170: ......
Page 171: ...ment Panel R 3 2 1 0 6 5 4 rpm TRIM UP DN EL VOLT OIL TEMP 60 MPH ICATOR 6000 RPM...
Page 172: ......
Page 173: ...nd Fuel Routing...
Page 174: ......
Page 176: ......
Page 177: ...witch Panel ITCH PANEL DESCRIPTION WATER PUMP OPTION MANUAL BILGE PUMP ACCESSORY NOT USED...
Page 178: ......
Page 179: ...d Switch Panel DESCRIPTION DIMMER NAVIGATION ANCHOR LT HORN TCH PANEL...
Page 180: ......
Page 181: ...Switch Panel SIZE 5 AMPS 10 AMPS R 15 AMPS...
Page 182: ......
Page 183: ...ument Panel OIL TEMP...
Page 184: ......
Page 185: ...and Fuel Routing...
Page 186: ......
Page 188: ......
Page 189: ...Switch Panel DESCRIPTION WATER PUMP OPTION MANUAL BILGE PUMP ACCESSORY NOT USED...
Page 190: ......
Page 191: ...rd Switch Panel DESCRIPTION DIMMER NAVIGATION ANCHOR LT HORN ITCH PANEL...
Page 192: ......
Page 193: ...y Switch Panel SIZE 5 AMPS 10 AMPS R 15 AMPS...
Page 194: ......
Page 196: ......
Page 197: ...ument Panel T OIL TEMP...
Page 198: ......
Page 199: ...and Fuel Routing TOILET TO DOCKSIDE PUMPOUT DRAIN HOSE P...
Page 200: ......
Page 202: ......
Page 203: ...Switch Panel DESCRIPTION WATER PUMP OPTION MANUAL BILGE PUMP ENGINE HATCH...
Page 204: ......
Page 205: ...rd Switch Panel DESCRIPTION DIMMER NAVIGATION ANCHOR LT HORN ITCH PANEL...
Page 206: ......
Page 208: ......
Page 209: ...ull Locations...
Page 210: ......
Page 211: ...ument Panel OIL TEMP...
Page 212: ......
Page 213: ...ng Hose Route...
Page 214: ......
Page 216: ......
Page 218: ......
Page 219: ...rive Trim Panel VE TRIM PANEL CH...
Page 220: ......
Page 221: ...Switch Panel SIZE 10 AMPS 20AMPS 10 AMPS 10 AMPS...
Page 222: ......
Page 223: ...rive Trim Panel E TRIM PANEL SWITCH SWITCH...
Page 224: ......
Page 225: ...Switch Panel SIZE 10 AMPS 20AMPS 10 AMPS 10 AMPS 10 AMPS...
Page 226: ......
Page 228: ......
Page 230: ......
Page 231: ...e Instrument Panel OLT OIL TEMP UEL VOLT OIL TEMP 0 6000 RPM N PH DICATOR 0 6000 RPM ICATOR...
Page 232: ......
Page 233: ...g Hose Routing...
Page 234: ......
Page 235: ...ose Routing FUEL FILL LINE TANK...
Page 236: ......
Page 238: ......
Page 240: ......
Page 242: ......
Page 243: ...ull Locations WETBAR SINK DRAIN WATER TANK VENT ANCHOR LOCKER DRAIN ABLE EXHAUST OPTION...
Page 244: ......
Page 245: ...ument Panel...
Page 246: ......
Page 247: ...Routing Sheet 1 of 2...
Page 248: ......
Page 249: ...Routing Sheet 2 of 2...
Page 250: ......
Page 252: ......
Page 254: ......
Page 255: ...ne Drive Trim Panel VE TRIM PANEL CH...
Page 256: ......
Page 257: ...gine Switch Panel SIZE 10 AMPS 20AMPS 10 AMPS 10 AMPS...
Page 258: ......
Page 259: ...e Drive Trim Panel E TRIM PANEL SWITCH SWITCH...
Page 260: ......
Page 261: ...ine Switch Panel SIZE 10 AMPS 20AMPS 10 AMPS 10 AMPS 10 AMPS...
Page 262: ......
Page 263: ...ull Locations E TANK OPTIONAL AR REFRIGERATOR ANCHOR LOCKER DRAIN R TANK HIGHWATER BILGE PUMP...
Page 264: ......
Page 265: ...e Instrument Panel RUMENT PANEL R 10 70 20 30 40 50 45 60 TRIM UP DN R 3 2 1 0 6 5 4 rpm...
Page 266: ......
Page 267: ...e Instrument Panel...
Page 268: ......
Page 270: ...this is text...
Page 272: ...this is text...
Page 274: ...this is text...
Page 276: ...this is text...
Page 278: ...this is text...
Page 280: ...this is text...
Page 282: ...this is text...
Page 284: ...this is text...
Page 286: ...this is text...
Page 288: ...this is text...
Page 290: ...this is text...
Page 292: ...this is text...
Page 294: ...this is text...
Page 296: ...this is text...
Page 298: ...this is text...
Page 300: ...this is text...
Page 302: ...this is text...