Chore-Tronics Feeder Control
Installation and Operation of Scale Load Cells
63
MT1559A
10/6/99
Side bar (item 14) is threaded to receive bolts. It is important that
bolts (item 8) not be tightened all the way. Leave 1/8” clearance for
side bars (items 7 and 14) to move freely. Install lock washer and nut
on bolt (item 8).
6.For proper checking of side loads each mount must be installed rotated relative to
the others. i.e.; side bars (items 7 and 14) must point in different directions.
Do not weld near load cells or cables.
7.Remove load cells or cables from area to be welded. Always disconnect indicator
from junction box when welding on frame or bin. When welding on frame, place
ground on frame as close as possible to area to be welded. When welding on bin,
place ground on bin, if welding current is allowed to pass through load cells, it will
damage them.
{Note}
*
<Caution>
Key
Description
1
5/8” Hex Nut (not supplied)
2
C.T. Mount Half
3
5/8” Lock Washer (not supplied)
4
5/8” Hex Head Bolt (not supplied)
5
C.T. Load Cell
6
Sealing Ring
7
C.T. Mount Welded Plate
8
Hex Head Bolt
9
Cotter Pin
10
C.T. Mount Pin
11
Steel Plate
12
Rubber Shim
13
5/8” Concrete Anchor (not supplied)
14
C.T. Mount Threaded Plate
15
Lock Washer
16
Hex Nut
Figure 28. C.T. Mount Base Installation
3/25/99