ChipBLASTER Inc
7
2.0.
Table of Contents (Cont.):
Return pump - Check for leaks
Section 14.30
Page 33
Return pump - Check inlet and outlet
Section
14.31 Page
33
Troubleshooting
Section
15.0
Page
34
Troubleshooting flow chart (Figure 3)
Section 15.1
Page 35
Pressure
adjustment
procedure
Section
16.0
Page
36
High pressure pump replacement Section
17.0
Page
37
Belt
installation
Section
18.0
Page
38
Deflection
force
chart
Section
18.5
Page
40
System contamination purging procedure
Section
19.0
Page
41
Electrical
drawings Section
20.0
Page
43
Mori Seiki Power Interface
Section
20.0
Page
51
Mori Seiki Control Interface Section
20.0
Page
52
Daewoo/Doosan
Interface Section
20.0
Page
53
Kiwa Interface Section 20.0
Page 54
Schematic
piping
drawing Section
21.0
Page
59
Mechanical
assembly
Section
22.0
Page
60
Gauge Panel – Top
Section
22.1
Page
60
Control
Panel
–
Front
Section
22.2
Page
61
Control Panel – Inside Enclosure Section
22.3
Page
62
Sub Plate Elevation – Left Side
Section 22.4
Page 63
Sub Plate Elevation – Right Side
Section 22.5
Page 64
Manifold block assembly Section
22.6
Page
65
Filter
Assembly
Section
22.7
Page
66
Ship
Loose
Items
Section
22.8
Page
67
Spare
Parts
Section
22.13 Page
68
Footprint
drawing
Section
23.0
Page
69
Warranty
Section
24.0
Page
70
Warranty (limited) – New equipment
Section
24.1
Page
70
Warranty (limited) – Used equipment
Section
24.2
Page
72
Warranty (limited) – Retrofits
Section
24.3
Page
74
Warranty claim form
Section
24.4
Page
76
Warranty registration card Section
24.5
Page
77
Warranty validation card
Section
24.6
Page
78
Optional
Equipment Section
27.0
Page
79
Machine Sump Standpipe Assembly
Section 27.1
Page 79
Supplement
Data
Section
28.0
Page
80
1000
PSI
orifice
chart
Section
28.1
Page
80
2.0