Chiltrix Inc.
Piping Examples: Stacked Heat Pumps
Non-Preferred
Optional Method, multiple heat
pumps piped in parallel:
(Requires additional loop pump supplied by
installer)
PLEASE SEND YOUR PROPOSED FINAL DESIGN TO CHILTRIX SUPPORT DEPARTMENT FOR
APPROVAL, COMMENTS, AND SUGGESTIONS
6
Preferred Method For 2 or 3 Units:
See Design Guide Here
https://www.chiltrix.com/documents/chiller-options.pdf
PLEASE ALWAYS SUBMIT YOUR DESIGN TO
CHILTRIX FOR APROVAL
Summary of Contents for CX34-4
Page 4: ...Chiltrix Inc www chiltrix com CX34 Components 4 ...
Page 18: ...Chiltrix Inc www chiltrix com Electric Connections and Component Locator 18 ...
Page 19: ...Chiltrix Inc www chiltrix com CX34 System Wiring Diagram 19 ...
Page 25: ...Chiltrix Inc www chiltrix com G3 VALVE Seasonal Switch Valve G3 Ports 25 ...
Page 34: ...Chiltrix Inc www chiltrix com 34 Language Screen Screen Saver ...
Page 35: ...Chiltrix Inc www chiltrix com 35 Touch Screen Fixing Calibration Time Setting ...
Page 52: ...Chiltrix Inc www chiltrix com 52 ...