Installation Instructions
LVM Series
13
Figure 10
6.
Use four 5/16-18 x 3/4" button head flange screws (HH) to
secure each attached clamp bracket (P) to a quick connect
base (Q). (See Figure 11)
Figure 11
NOTE:
If rails must be installed over cable management holes
on column, cables must be routed prior to installing
rails onto quick connect bases. See Cable
Management section for details.
7.
Install two 5/16-18 x 3/4" button head flange screws (HH)
into the top holes on each quick connect base (Q). (See
Figure 12)
Figure 12
8.
Hang rails (K or L) into screws installed in previous step to
quick connect bases (Q). (See Figure 12)
IMPORTANT ! :
If installing the triple display rail (L),
install rail to left and center columns so that add-on rail
can be installed to right column. See Add-On Rail
Installation section for details.
9.
Install two 5/16-18 x 3/4" button head flange screws (HH)
into the lower holes on each quick connect base (Q) to
secure rails to quick connect bases. (See Figure 13)
10. Tighten all 5/16-18 x 3/4" button head flange screws (HH).
Figure 13
(FF)
(NN)
5
5
(JJ) x 2
display
height
4
(Q)
(HH) x 4
6
(P)
(HH) x 2
8
8
7
(Q)
(K or L)
(HH) x 2
9