
Installation Instructions
LVM Series
17
Adjustments
Height Adjustment
1.
Use upper knob on back of interface brackets (AA and BB)
to adjust the height of each display. (See Figure 21)
NOTE:
Adjust both brackets in order to maintain a level mount.
Plumb Adjustment
2.
Use middle and lower knobs on back of interface brackets
(AA and BB) to make plumb adjustments to each display
(See Figure 21)
Figure 21
Cable Management
1.
Route cables from displays through nearest holes on front
of columns and out through back cable management hole.
(See Figure 22)
NOTE:
For best access, route display cables through columns
prior to display installation. See Cable Management
section for details.
Figure 22
Additional Cable Management Options
2.
Cables may be routed through tops of columns and out
through the back cable management hole. (See Figure 23)
Figure 23
3.
If rails needed to be installed on top of cable management
holes, cables may be routed through quick connect bases
(Q) prior to the rails being installed. (See Figure 24)
4.
Install rails according to Rails Installation section making
sure cable is routed through cable opening on quick
connect base (Q). (See Figure 24)
Figure 24
1
1
2
2
(display not shown for clarity)
(displays not shown for clarity)
1
1
1
1
2
2
cable from uninstalled
display
3
4