background image

8

Installation Instructions

CABLE MANAGEMENT

WARNING: Make sure your cables do not run through 

a pinch point.

1. Route power/audio/video cables through the cable channel 

in top arm (see Figure 5), allowing sufficient slack in 
cables for extension and avoiding pinch points, and secure 
cables using two clips and two tiewraps (40, not shown).

2. Route power/audio/video cables along bottom arm (see 

Figure 6), using tiewraps (40, not shown) to secure cables 
to each arm, and through cable channel.

CAUTION:

To prevent equipment damage, do not route 
cables through holes in the display mounting 
plate

.

3. Route power/audio/video cables to an open area behind 

the mounting plate (not shown). Leave a sufficient amount 
of slack in cables to allow for connection and extension 
where needed.

Cables

Tiewraps

Top Cable

 Management Channel

Figure 5. Cable Management Channel (Top)

 Management Channel

Bottom Cable

Figure 6. Cable Management Channel (Bottom)

Summary of Contents for 25MWR

Page 1: ...s two lag bolts in the bottom bracket Next the installer mounts the display and connects the power audio video cables which are diverted into the built in path in the flexible single arm After making...

Page 2: ...play placed on the 25 MWR must not exceed 125 lbs 56 7kg the maximum load capacity of the 25 MWR WARNING Watch for pinch points Do not put your fingers between movable parts WARNING Make sure the moun...

Page 3: ...3 Installation Instructions DIMENSIONAL DRAWING...

Page 4: ...include the MSB interface bracket INTERFACES Table 2 on page 4 provides the applicable MWR interfaces TOOLS REQUIRED FOR INSTALLATION Allen wrench set Drill and bit set Wrench set NOTE Other tools may...

Page 5: ...tical or horizontal 2 Using a stud sensor locate the two wood studs where you will mount the 25 MWR 3 Draw a level plumb line to indicate the desired height of the top mounting bracket 4 With an assis...

Page 6: ...o mounting holes in the bottom mounting bracket see Figure 3 Make sure to align the holes parallel to the holes drilled in the top bracket b Drill two pilot holes in the wall studs as follows If using...

Page 7: ...sistant slide the display down over the 25 MWR Make sure buttons of 25 MSB interface bracket fully engage all teardrop slots of the 25 MWR WARNING Make sure the locking device securing the dis play is...

Page 8: ...cables along bottom arm see Figure 6 using tiewraps 40 not shown to secure cables to each arm and through cable channel CAUTION To prevent equipment damage do not route cables through holes in the dis...

Page 9: ...ents 1 Using a 9 16 wrench slightly tighten or loosen lateral tilt tension adjustment nut see Figure 8 2 Mount the display and check for desired tilt tension 3 Repeat Steps 1 and 2 until desired tilt...

Page 10: ...onfiguring the mount Use the first and third slotted holes in the top and bottom mounting brackets Reconfiguring the Swing Arm Right of Center With some disassembly and reassembly you can move the swi...

Page 11: ...igure 14 4 Install retaining pin assemblies one top and one bottom and secure using two bolts one top and one bottom 5 Install four bolts two on the top and two on the bottom to secure the swing arm a...

Page 12: ......

Reviews: