background image

Installation Instructions

6

1. Mount the top bracket on the 25 MWR, as follows:

WARNING: Improper installation can result in serious 

personal injury!

a.With an assistant, lift and hang the 25 MWR on the 

two lag bolts and washers previously installed on 
the wall. See Figure 2.

NOTE: Make sure washers are installed in front of the 

top bracket, not behind the bracket. 

b.Slide the 25 MWR into the desired position on the 

wall and tighten the two lag bolts.

2.Mount the bottom bracket on the 25 MWR, as follows:

a.

Mark the two mounting holes in the bottom 
mounting bracket (see Figure 3). Make sure to 
align the holes parallel to the holes drilled in the 
top bracket.

b. Drill two pilot holes in the wall studs, as follows:

• If using 5/16” lag bolts, use a 7/32” drill bit.

• If using 3/8” lag bolts, use a 9/32” drill bit.

c.

Install two lag bolts and two washers into the 
pilot holes.

• If you used a 7/32” drill bit, use 5/16” lag bolts 

(40) and 5/16” washers (50).

• If you used a 9/32” drill bit, use 3/8” lag bolts 

(not supplied) and 3/8” washers (not supplied).

d. Tighten the two lag bolts.

 

Use Lag Bolts and Washers to

Figure 3. Mount Bottom Bracket on Wall

Mount the 25-MWR

Mount (Hang) the 25-MWR on Lag Bolts 

Figure 2. Mount 25-MWR on Lag Bolts

 Fasten 25-MWR to the Wall

Summary of Contents for 25MWR

Page 1: ...s two lag bolts in the bottom bracket Next the installer mounts the display and connects the power audio video cables which are diverted into the built in path in the flexible single arm After making...

Page 2: ...play placed on the 25 MWR must not exceed 125 lbs 56 7kg the maximum load capacity of the 25 MWR WARNING Watch for pinch points Do not put your fingers between movable parts WARNING Make sure the moun...

Page 3: ...3 Installation Instructions DIMENSIONAL DRAWING...

Page 4: ...include the MSB interface bracket INTERFACES Table 2 on page 4 provides the applicable MWR interfaces TOOLS REQUIRED FOR INSTALLATION Allen wrench set Drill and bit set Wrench set NOTE Other tools may...

Page 5: ...tical or horizontal 2 Using a stud sensor locate the two wood studs where you will mount the 25 MWR 3 Draw a level plumb line to indicate the desired height of the top mounting bracket 4 With an assis...

Page 6: ...o mounting holes in the bottom mounting bracket see Figure 3 Make sure to align the holes parallel to the holes drilled in the top bracket b Drill two pilot holes in the wall studs as follows If using...

Page 7: ...sistant slide the display down over the 25 MWR Make sure buttons of 25 MSB interface bracket fully engage all teardrop slots of the 25 MWR WARNING Make sure the locking device securing the dis play is...

Page 8: ...cables along bottom arm see Figure 6 using tiewraps 40 not shown to secure cables to each arm and through cable channel CAUTION To prevent equipment damage do not route cables through holes in the dis...

Page 9: ...ents 1 Using a 9 16 wrench slightly tighten or loosen lateral tilt tension adjustment nut see Figure 8 2 Mount the display and check for desired tilt tension 3 Repeat Steps 1 and 2 until desired tilt...

Page 10: ...onfiguring the mount Use the first and third slotted holes in the top and bottom mounting brackets Reconfiguring the Swing Arm Right of Center With some disassembly and reassembly you can move the swi...

Page 11: ...igure 14 4 Install retaining pin assemblies one top and one bottom and secure using two bolts one top and one bottom 5 Install four bolts two on the top and two on the bottom to secure the swing arm a...

Page 12: ......

Reviews: