background image

5

Installation Instructions

MWR INSTALLATION

WARNING: Improper installation can result in serious 

personal injury!

WARNING: It is the responsibility of the installer to verify 

that the wall to which the 25-MWR is anchored 
will safely support 

five times 

the combined 

load of all attached components and equip-
ment. If not, reinforce the structure before 
installing the 25-MWR.

Locate Wood Studs 16” Apart on Center

1. Determine the exact mounting location prior to installa-

tion, considering screen size and the unit’s total swing 
arm radius. Keep in mind that the 25-MWR must be 
mounted to wood studs that are 16” apart on center.

NOTE:Mount the 25-MWR between parallel wall studs 

or other supporting framework that is vertical 
or horizontal.

2. Using a stud sensor, locate the two wood studs where 

you will mount the 25-MWR.

3. Draw a level plumb line to indicate the desired height of 

the top mounting bracket.

4.With an assistant, lift and hold the 25-MWR against wall. 

Use a pencil, awl, or small nail to mark the mounting 
holes where two pilot holes will be drilled into the cen-
ter of the wood studs. Make sure the mounting holes are 
level.

5.With an assistant, lay the 25-MWR down on the floor.

6. Drill two pilot holes where the mounting holes were 

marked for anchoring the top bracket on the 25-MWR. See 
Figure 1.

NOTE: Do not tighten the lag bolts down at this time. 

Leave enough space between the wall and lag 
bolts to hang the 25-MWR.

NOTE: Lag bolts and flat washers are not supplied.

7. Install two lag bolts and two flat washers in the pilot 

holes drilled in step 6.

Figure 1. Two Wood Studs 16” Apart On Center

16”

Wood Studs 

Pilot Holes 

Wall 

Summary of Contents for 25MWR

Page 1: ...s two lag bolts in the bottom bracket Next the installer mounts the display and connects the power audio video cables which are diverted into the built in path in the flexible single arm After making...

Page 2: ...play placed on the 25 MWR must not exceed 125 lbs 56 7kg the maximum load capacity of the 25 MWR WARNING Watch for pinch points Do not put your fingers between movable parts WARNING Make sure the moun...

Page 3: ...3 Installation Instructions DIMENSIONAL DRAWING...

Page 4: ...include the MSB interface bracket INTERFACES Table 2 on page 4 provides the applicable MWR interfaces TOOLS REQUIRED FOR INSTALLATION Allen wrench set Drill and bit set Wrench set NOTE Other tools may...

Page 5: ...tical or horizontal 2 Using a stud sensor locate the two wood studs where you will mount the 25 MWR 3 Draw a level plumb line to indicate the desired height of the top mounting bracket 4 With an assis...

Page 6: ...o mounting holes in the bottom mounting bracket see Figure 3 Make sure to align the holes parallel to the holes drilled in the top bracket b Drill two pilot holes in the wall studs as follows If using...

Page 7: ...sistant slide the display down over the 25 MWR Make sure buttons of 25 MSB interface bracket fully engage all teardrop slots of the 25 MWR WARNING Make sure the locking device securing the dis play is...

Page 8: ...cables along bottom arm see Figure 6 using tiewraps 40 not shown to secure cables to each arm and through cable channel CAUTION To prevent equipment damage do not route cables through holes in the dis...

Page 9: ...ents 1 Using a 9 16 wrench slightly tighten or loosen lateral tilt tension adjustment nut see Figure 8 2 Mount the display and check for desired tilt tension 3 Repeat Steps 1 and 2 until desired tilt...

Page 10: ...onfiguring the mount Use the first and third slotted holes in the top and bottom mounting brackets Reconfiguring the Swing Arm Right of Center With some disassembly and reassembly you can move the swi...

Page 11: ...igure 14 4 Install retaining pin assemblies one top and one bottom and secure using two bolts one top and one bottom 5 Install four bolts two on the top and two on the bottom to secure the swing arm a...

Page 12: ......

Reviews: