9
4"(10 cm)
24" (61 cm)
24"
(61 cm)
STEP 1
DETERMINE LOCATION FOR THE OPERATOR
1.
The gate operator should be installed near the front roller of the gate or near the back of the gate (in the OPEN position). The space between the
gate and the output sprocket must be a minimum of 4 inches.
2. Lay out the concrete pad.
INSTALLATION
• To AVOID damaging gas, power or other underground utility lines,
contact underground utility locating companies BEFORE digging
more than 18 inches (46 cm) deep.
• DO NOT touch the heater when switch is on, heater may be hot.
4"(10 cm)
24" (61 cm)
24"
(61 cm)
REAR INSTALLATION