9
INSTALLATION STEP 2
Install the Header Bracket
You can attach the header bracket either to the wall
above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular
requirements.
Do not install the header bracket
over drywall. If installing into masonry, use
concrete anchors (not provided).
WALL HEADER BRACKET INSTALLATION
• Center the bracket on the vertical centerline with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
• Mark the vertical set of bracket holes (do not use
the holes designated for ceiling mount). Drill 3/16"
pilot holes and fasten the bracket securely to a
structural support with the hardware provided.
Lag Scre
w
5/16"-9x1-5/
8
"
HARDWARE SHOWN ACTUAL SIZE
Lag Scre
w
s
5/16"-9x1-5/
8
"
Highest Point of
Garage Door Tra
v
el
V
ertical
Centerline of
Garage Door
Header
Wall
Garage
Door
UP
CEILING MOUNT ONLY
Wall Mo
u
nting Holes
Optional
Wall Mo
u
nting Holes
The nail hole is for
positioning only.
Yo
u
m
u
st
u
se lag scre
w
s
to mo
u
nt the header
b
racket.
UP
CE
ILIN
G M
OU
NT O
NL
Y
Door Spring
Header
Bracket
2x4
Str
u
ct
u
ral
S
u
pport
V
ertical
Centerline of
Garage Door
Horizontal
Line
UP
CEILING MOUNT ONLY
Ceiling Mo
u
nting Holes
The nail hole is for
positioning only.
Yo
u
m
u
st
u
se lag scre
w
s
to mo
u
nt the header
b
racket.
UP
Lag Scre
w
s
5/16"-9x1-5/
8
"
Garage Door
V
ertical
Centerline
of Garage Door
Header Wall
– Finished Ceilin
g
–
Header
Bracket
6" (15 cm)
Maxim
u
m
V
ertical
Centerline
of Garage Door
Door
Spring
CEILING HEADER BRACKET INSTALLATION
• Extend the vertical centerline onto the ceiling as
shown.
• Center the bracket on the vertical mark, no more
than 6" from the wall. Make sure the arrow is
pointing toward the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.
• Mark the side holes. Drill 3/16" pilot holes and
fasten bracket securely to a structural support with
the hardware provided.