6.0 Installation & Setup
11
6.0 Installation & Setup
6.1 Inspecting Shipment
This machine has been carefully packed to prevent damage during shipment. However, claims for
damage or loss are the responsibility of the recipient. Inspect all shipments as soon as they are
received. If there is any noticeable damage, note it on the freight bill. Visual and/or hidden damage
must be reported to the claims department of the carrier within 15 days. Contact your dealer if you
need any assistance. Check the contents of the box against the packing list on page 8. Make sure
there are no missing items.
6.2 Uncrating
This machine is lagged to a wood skid and covered with a triple-walled corrugated container. Loosen
the flaps of the carton where they are attached to the skid. When loose, the carton can be lifted
straight up. Remove the side tables and accessory box, which are also attached to the skid. Place
the cutter/skid about where the machine will be positioned and remove the lag screws from the skid.
6.3 Lifting/Moving Instructions
Unpacking, handling, and positioning should be done by professional riggers. If handling or
unpacking is a problem, your dealer or a local trucking facility should be able to supply or recommend
a qualified rigger. This 2550-lb/1157-kg machine should be moved with experienced people and the
proper equipment. Do not risk personal injury or damage by attempting to move machinery with
inadequate equipment or manpower.
Lifting straps may also be used to lift the machine by placing the straps around the front and rear of
the table. When straps are used in this way, wood blocks must be placed beside the lead screw to
prevent damage, (Figure 2). A bent lead screw will cause the backgauge to bind.
Figure 2
The backgauge should be positioned all the way to the front of the table and straps placed as close
the machine body as possible. Gently lift the cutter, remove the skid and carefully place the cutter on
the floor.
Once the machine is off its skid, it can be moved with a forklift or pallet jack from the front. DO NOT
attempt to lift the machine from the sides or rear.
Summary of Contents for CHAMPION 305 TC
Page 10: ...5 0 Footprint 10 5 0 Footprint...
Page 24: ...8 0 Knife Installation Changing 24 NOTES...
Page 57: ...14 0 Troubleshooting 57 NOTES...
Page 60: ...15 0 Schematics Parts Lists 60 15 2 Main Assembly Hydraulics 47900 Sheet 2...
Page 62: ...15 0 Schematics Parts Lists 62 15 3 Main Assembly Clamp 47900 Sheet 3...
Page 64: ...15 0 Schematics Parts Lists 64 15 4 Main Assembly Final Wiring 47900 Sheet 4...
Page 68: ...15 0 Schematics Parts Lists 68 15 6 Main Assembly Electrical Components Upper 47900 Sheet 6...
Page 70: ...15 0 Schematics Parts Lists 70 15 7 Main Assembly Air Table 47900 Sheet 7...
Page 72: ...15 0 Schematics Parts Lists 72 15 8 Main Assembly Table Mounting 47900 Sheet 8...
Page 76: ...15 0 Schematics Parts Lists 76 15 10 Main Assembly Knife 47900 Sheet 11...
Page 78: ...15 0 Schematics Parts Lists 78 15 11 Main Assembly Covers and Labels 47900 Sheet 12...
Page 80: ...15 0 Schematics Parts Lists 80 15 12 Main Assembly Table Extensions 47900 Sheet 13...
Page 82: ...15 0 Schematics Parts Lists 82 15 13 Power Panel Assembly EE 3461 Sheet 1 Rev D...
Page 85: ...15 0 Schematics Parts Lists 85 Power Panel Assembly EE 3461 Sheet 2 Rev D...
Page 86: ...15 0 Schematics Parts Lists 86 15 14 Basic Machine Schematic E 3462 Rev C...
Page 87: ...15 0 Schematics Parts Lists 87 15 15 Interconnection Diagram E 3463 Rev A...
Page 92: ...15 0 Schematics Parts Lists 92 15 17 Hydraulic Schematic H 468 3 Rev B...
Page 95: ...15 0 Schematics Parts Lists 95 EE 3339 Sheet 2 Rev F...
Page 98: ...15 0 Schematics Parts Lists 98 EE 3382 1 Sheet 2 Rev A...
Page 102: ...15 0 Schematics Parts Lists 102 15 25 Air Table Blower Assembly 47578 Rev C...
Page 104: ...15 0 Schematics Parts Lists 104 15 27 Power Panel Connection Procedure Label S 1781 211 Rev A...
Page 105: ...15 0 Schematics Parts Lists 105 15 28 Warning Label S 1781 16 Rev D...
Page 108: ...15 0 Schematics Parts Lists 108 NOTES...
Page 110: ...F 254 J May 2014...