Name of task
670. Remove Cap
around outer beam
dump
Exposed people
Local dose rate
0.1 µSv/hr
Workforce
3 people
Time needed
0.5 days
Calculated dose
Responsible
EN-EA
Involved
EN-EA/ EN-HE
Comments:
Installed with mobile crane.
Has been fixed to the roof of building 380 with M10
screws.
The cherry picker will be needed.
THIS SHOULD BE DONE IN THE SUMMER TO
AVOID WINTER WEATHER.
The sole purpose of tasks 580-620 is to open the
roof access, so that the new long vacuum chamber
(9 meters long) can be installed.
For this reason, they will be performed once the
new chamber is ready for installation. In this way,
the opening of the roof, installation of the chamber
and closing of the roof will be performed as a single
operation over one or more days.
Questions:
Can the cap be quickly replaced in case of bad
weather/end of working day/weekend?
Cap
Summary of Contents for ATOMTEX BDKG-24
Page 62: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 62 of 93...
Page 65: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 65 of 93...
Page 68: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 68 of 93...
Page 73: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 73 of 93...