Name of task
620. Pipe assembly
removal, cooling
station side
Exposed people
Local dose rate
Workforce
Time needed
Calculated dose
Responsible
EN-STI
Involved
EN-EA/ EN-HE/ HSE-RP/ EN-
CV
Comments:
The pipes connecting the cooling station to the
pit form one assembly.
There are two circular plates on each end. These
plates are bolted to the walls with 4 fasteners.
The silicone should be removed on the cooling
station side, and the fasteners removed.
Summary of Contents for ATOMTEX BDKG-24
Page 62: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 62 of 93...
Page 65: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 65 of 93...
Page 68: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 68 of 93...
Page 73: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 73 of 93...