REFERENCE
EDMS NO.
REV.
VALIDITY
TOF-TAR-PRD-0001
1867100
1.0
RELEASED
Page 35 of 93
Name of task
252. Remove steel
shielding from
around vacuum
chamber
Exposed people
Local dose rate
10 µSv/hr
Workforce
4 people
Time needed
2 hours
Calculated dose
Responsible
EN-EA
Involved
EN-EA/ EN-HE/ HSE-RP
Comments:
Installed with monorail.
But monorail won’t be
available at this point.
Some concrete blocks could be left to support
the steel.
12 steel panels (2 x 36.5kg on top, 10 x 52.2kg)
JL Grenard says to assume that these can be
removed by 2 people and passed to 2 people in
the gallery.
0.985m
36 kg
Summary of Contents for ATOMTEX BDKG-24
Page 62: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 62 of 93...
Page 65: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 65 of 93...
Page 68: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 68 of 93...
Page 73: ...REFERENCE EDMS NO REV VALIDITY TOF TAR PRD 0001 1867100 1 0 RELEASED Page 73 of 93...